Skip to main content

Boroughbridge Methodist Church
Conservation and Refurbishment

  • Location

    Boroughbridge

  • Project Cost

    £150,000

The project brief was to improve the thermal performance of the church hall building and to reconfigure the internal connection with the church. This was achieved through the installation of specialist double glazed, steel windows as well as internal wall insulation. The grant funded project has seen a significant increase in the hall’s bookings since the work was completed in summer 2015.